A design and Construct new build of a Laboratory in an existing warehouse that included a change of purpose of the building. Maintaining the operation of the existing lab with only a day and a half shut down to relocate required lab infrastructure from old premises to new.
Key Features
- 6-week construction
- Testing Laboratory
- Design and Change of Purpose
- Defect Free
- Oil & Gas Client
- Separate Defit of old Laboratory
- Live environment (Client needed to be operational throughout project with limited time to repurporse lab equipment.)