Geo Tech Lab
A design and Construct new build of a Laboratory in an existing warehouse that included a change of purpose of the building. Maintaining the operation of the existing lab with only a day and a half shut down to relocate required lab infrastructure from old premises to new.
Key Features
- 6-week construction
- Testing laboratory
- Design and change of purpose
- Defect free
- Oil and gas client
- Separate defit of old laboratory
- Live environment (client needed to be operational throughout project with limited time to repurpose lab equipment)
This is a great example of a unique custom fitout that Schlager Group can deliver. Scroll down for more images, or for more information about building a custom fitout with Schlager Group, please contact us. We would love to hear from you.