Geo Tech Lab

A design and Construct new build of a Laboratory in an existing warehouse that included a change of purpose of the building. Maintaining the operation of the existing lab with only a day and a half shut down to relocate required lab infrastructure from old premises to new.

Key Features

  • 6-week construction
  • Testing laboratory
  • Design and change of purpose
  • Defect free
  • Oil and gas client
  • Separate defit of old laboratory
  • Live environment (client needed to be operational throughout project with limited time to repurpose lab equipment) 

This is a great example of a unique custom fitout that Schlager Group can deliver. Scroll down for more images, or for more information about building a custom fitout with Schlager Group, please contact us. We would love to hear from you.