Personnel and Server Room

Design and Construction of a HR Dept offices and the splitting and redesigning of the Server Room including Fire services.

Key Features

  • 8 Week construction
  • Design and Construct
  • Defect Free
  • Installation of new fire wall and doors
  • Installation of new FM200 system
  • Upgrade of VESDA fire systems (ceiling and in floor)
  • Reconfiguring of walls.
  • Live Environment (offices occupied and server room  in use which could not be shut down during construction)